Whiddons Aged Care QLD
Newcastle Private Hospital
X200 Densi-Proof
Applied at time of pour to the operating theatres. To Cure, Harden, Densify & Waterproof the concrete. Vinyl can be laid two weeks after pour without the need to remove a membrane or pay for a RH/moisture test. The concrete will be fully protected from any moisture transmission
X550 Carpark Warehouse
Applied to all car park areas and ramps to Cure, Harden, Densify & Repel Contamination from the surface of the concrete.


Bendigo Hospital VIC
X200 Densi-Proof™
Applied to all concrete slabs at time of pour. Used as a Curing compound, Densifier and Hardener. Concrete is permanently waterproofed.
Epoxy paint system and vinyl will not require mechanical abrasion or acid etching before application.
Gold Coast University Hospital QLD
X200 Densi-Proof™
Applied to all concrete slabs at time of pour. Used as a curing Compound, Densifier and Hardener. Concrete is permanently waterproofed.
Epoxy paint system & Vinyl will not require mechanical abrasion or acid etching before application.
Busselton Health Campus
X220 Moisture Fix applied to 10,000 M²
The new Busselton Health Campus was construction after demolition of the old hospital creating a new facility which includes 64 overnight and 20 same-day beds, a renal unit, two theatre. a procedure room and an expanded emergency department.
In addition, an expanded medical imaging department, an ambulatory care centre, community health, mental health, aged care, specialist outpatient consulting rooms and a dental clinic complete the project.



Toronto Residential Aged Care Facility
Completed 2016 a four-storey, 147 bed facility, including lounges, communal open spaces, an internal courtyard and associated roads and car parking.
Sunshine Coast Hospital QLD
X200 Densi-Proof™ applied to all concrete slabs 160,000 M2 at time of pour. Used as a curing compound, Densifier, Waterproofer & Hardener.
Epoxy paint system & Vinyl will not require mechanical abrasion or acid etching before application.
St Vincents Private Hospital NSW
X200 Densi-Proof™ was applied to 5000 M2 at time of pour to Cure, Waterproof, Harden and Densify the concrete
St Johns Retirement Village VIC
X220 Moisture Fix® was applied to 3600 Square Metres at time of pour to Cure, Waterproof, Harden and Densify the concrete
Northern Beaches Hospital
X550 Carpark Warehouse was applied to 1400 carpark spaces to Cure, Harden, Densify & Repel contamination from the surface
